top of page

Lighting Improvement Compliance Pathway

To comply through the Lighting Improvement Pathway, 97% of the lighting fixtures or 90% of the lighting load for your small building must be LEDs. 

Multi-tenant buildings pursuing this pathway must combine all documentation into one submission and should refer to section 3.1.3.1 of the
Technical Guidance for more information.

Lighting Professional Pathway Compliance Steps

Choose this pathway if you're working with a lighting professional to complete LED upgrades or verify lighting that already meets the requirement. 

1

Find a certified lighting professional and ask them to include compliance documentation and submission in their scope of work — the Lighting Professional Pathway Checklist offers guidance on selecting a contractor for this work.

2

Work with your lighting professional to create a plan for replacing lighting fixtures with LEDs or verifying the LED lighting you already have.

3

Your lighting professional will fill out the Lighting Verification Template, a list of all the lighting fixtures in your building. 

4

You or your lighting professional will complete the Lighting Compliance Form and upload the Lighting Verification Template (Excel file).

Note: If you complete the form yourself, you'll need to ask your lighting professional for a signed PDF Letter of Attestation and a copy of their credentials to attach to your submission. 

Within 10 days of submission, you will receive an email confirming your building’s compliance status or requesting additional information. During high-volume periods, this timeline may be extended.

Lighting Self-Verification Pathway Compliance Steps

Choose this pathway if your building already meets the LED lighting requirement and you want to verify it yourself. 

1

Complete the Lighting Verification Template for all lighting fixtures in your building that are connected to the building’s electrical meters, including interior, exterior and parking area lighting. You can fill out the form as the building owner or have a designated building associate (e.g., a handyman or facility manager) complete it for you.  

Find additional guidance in the Lighting Self-Verification Pathway Checklist.

2

The same person who completed the Lighting Verification Template will then complete the Lighting Compliance Form, making sure to upload the template (Excel file).

Within 10 days of your submission, you will receive an email confirming your building’s compliance status or requesting additional information. During high-volume periods, this timeline may be extended. 


The city may conduct on-site audits of randomly selected buildings. If you refuse an on-site audit or discrepancies with your submission are found, you will need to take corrective action to be considered in compliance. 

WATCH: Understanding How to Identify LED Lighting

If you’re not sure whether your building has LED lighting fixtures, this video can help you identify LED lighting and fixtures.

Need More Time?

You can adjust your building’s compliance deadline by submitting the timeline extension application to allow for additional planning and implementation time.

If you need additional support or are unsure which compliance pathway is best for your building, schedule a call with the Help Desk.

Small Buildings Shortcuts

Use these links to move between pages for buildings 5,000 - 24,999 sq. ft.

Claim Your Building

Confirm Your Deadline

Determine Your Status

Choose Your Pathway

Renewables Pathway

Contact Us

We want to work collaboratively with you toward energy efficiency.  

No matter your issue – big or small – the Energize Denver Help Desk is here to answer questions, guide you through the process, and connect you with resources to make compliance more manageable and affordable.

If you need more support, reach out and our team will work to get you the assistance you need. ​​

Hours: 8 AM - 5 PM, Monday - Friday

Phone: 844-536-4528

Email Large Buildings: energizedenver@denvergov.org

bottom of page